
MY PROJECTS PORTFOLIO
Rochester City Hall Annex
Rochester, New Hampshire
Renovation of the existing town annex. Formerly the Rochester Fire Station dating back to horse drawn apparatus. The Annex is directly adjacent to the Rochester Town Hall and Opera House on one side and the active Rochester Fire House on the other. Barrier free access was maintained to the town hall and Opera house throughout the site work construction. The site work included new underground infrastructure, new emergency power for the active Fire Station. A new public space courtyard/ hardscapes and parking.
Residential Work
Lakes Region, New Hampshire
If you’re looking for a certified Excavating Contractor to manage a really complex job, consider this project a testament to my abilities to deliver quality results on time and within budget. I worked closely with my client to understand their needs and preferences, and the success of the outcome speaks for itself.
Wolfeboro Public Library
Wolfeboro, New Hampshire
Wolfeboro Public Library project was the construction of an addition, an entire wrap-around facade, and full renovation of the existing library. A new BMP storm management system, BMP Rain garden retention system, site lighting, new electrical and communication systems underground, water services to support fire suppression systems, as well as doubling the parking capacity was required.The greatest challenge for the project was the library's plan to stay open to the public as well as continuing to provide a variety of programs to the community throughout the construction process. Site phasing plans were required in addition to attention to public access and public safety during construction were critical. Wolfeboro, a popular summer resort town, made what it typically the most productive months for construction, the most challenging during construction as the summer population grew.
Cumberland Farms
Somersworth, New Hampshire
Ground up construction of a Cumberland Farms convenience store and fueling station. Site work included foundation construction, Building underground infrastructure, parking irrigation and landscaping. Traffic control and signage planning on state highway Rt 106 and Blackwater Road were required for improvements made. The largest project challenge was the accelerated schedule restraints placed on the project team by Cumberland Farms, for business reasons. Start to finish, doors open for customers 4 months!
YMCA CAMP Belknap
Mirror Lake
Renovation of the existing town annex. Formerly the Rochester Fire Station dating back to horse drawn apparatus. The Annex is directly adjacent to the Rochester Town Hall and Opera House on one side and the active Rochester Fire House on the other. Barrier free access was maintained to the town hall and Opera house throughout the site work construction. The site work included new underground infrastructure, new emergency power for the active Fire Station. A new public space courtyard/ hardscapes and parking.
Deer Run
Freedom, New Hampshire
Berry Pond
Moultonborough, New Hampshire
Dockside Sewer Replacement
Wolfeboro, New Hampshire
The replacement of sewer pipe for business and residence along Lake Winnipesaukee at Wolfeboro Town Docks. The project was competed in the early spring when lake levels are at the highest. De-watering was required as well as employing the use of Frack Tanks to control sedimentation and turbidity of water prior to discharge in the lake. The average depth of piping is 3’-6” below lake level. Final tie in to main transmission piping was accomplished in State Road Route 28 using pit less pipe liner techniques.