• Instagram - Black Circle

PO Box 151 Wolfeboro Falls, NH 03896

15 Route 28 Ossipee, NH 03864

©2018 by Integrity Earthworks.

MY PROJECTS PORTFOLIO

Rochester City Hall Annex

Rochester, New Hampshire

Renovation of the existing town annex. Formerly the Rochester Fire Station dating back to horse drawn apparatus. The Annex is directly adjacent to the Rochester Town Hall and Opera House on one side and the active Rochester Fire House on the other. Barrier free access was maintained to the town hall and Opera house throughout the site work construction. The site work included new underground infrastructure, new emergency power for the active Fire Station. A new public space courtyard/ hardscapes and parking.

Residential Work

Lakes Region, New Hampshire

If you’re looking for a certified Excavating Contractor to manage a really complex job, consider this project a testament to my abilities to deliver quality results on time and within budget. I worked closely with my client to understand their needs and preferences, and the success of the outcome speaks for itself.

Wolfeboro Public Library

Wolfeboro, New Hampshire

Wolfeboro Public Library project was the construction of an addition, an entire wrap-around facade, and full renovation of the existing library. A new BMP storm management system, BMP Rain garden retention system, site lighting, new electrical and communication systems underground, water services to support fire suppression systems, as well as doubling the parking capacity was required.The greatest challenge for the project was the library's plan to stay open to the public as well as continuing to provide a variety of programs to the community throughout the construction process. Site phasing plans were required in addition to attention to public access and public safety during construction were critical. Wolfeboro, a popular summer resort town, made what it typically the most productive months for construction, the most challenging during construction as the summer population grew.

Cumberland Farms

Somersworth, New Hampshire

Ground up construction of a Cumberland Farms convenience store and fueling station. Site work included foundation construction, Building underground infrastructure, parking irrigation and landscaping.   Traffic control and signage planning on state highway Rt 106 and Blackwater Road were required for  improvements made. The largest project challenge was the accelerated schedule restraints placed on the project team by Cumberland Farms, for business reasons. Start to finish, doors open for customers 4 months!

YMCA CAMP Belknap

Mirror Lake

Renovation of the existing town annex. Formerly the Rochester Fire Station dating back to horse drawn apparatus. The Annex is directly adjacent to the Rochester Town Hall and Opera House on one side and the active Rochester Fire House on the other. Barrier free access was maintained to the town hall and Opera house throughout the site work construction. The site work included new underground infrastructure, new emergency power for the active Fire Station. A new public space courtyard/ hardscapes and parking.

Deer Run

Freedom, New Hampshire

Berry Pond

Moultonborough, New Hampshire

Dockside Sewer Replacement

Wolfeboro, New Hampshire

The replacement of sewer pipe for business and residence along Lake Winnipesaukee at Wolfeboro Town Docks. The project was competed in the early spring when lake levels are at the highest. De-watering was required as well as employing the use of Frack Tanks to control sedimentation and turbidity of water prior to discharge in the lake. The average depth of piping is 3’-6” below lake level. Final tie in to main transmission piping was accomplished  in State Road Route 28 using pit less pipe liner techniques.

Riverbend Franklin

Franklin, New Hampshire